The Building Cost Index (BCI), also known as Consolidated Labour & Material Index (CL&MI), is the total of 45% of Labour Index and 55% of Material Index related to a base of 100 at the first quarter of 1970. The Highways Department Construction Cost Index (HyD CCI) is the total of 60% of the average Material Index and 40% of the Labour Index which are published monthly by the Census & Statistics Department related to a base of 100 at November 1975. The Civil Engineering Works Index (CEWI) is based on the Labour Index and various material costs indices published monthly by the Census & Statistics Department related to a base of 100 at 1980.
YEAR | QUARTER | CEWI | MONTH | BCI | HyD CCI |
---|---|---|---|---|---|
1998 | 2 | 402.8 | 4 | 1687.6 | 809.6 |
5 | 1705.3 | 813.3 | |||
6 | 1695.5 | 812.8 | |||
3 | 402.1 | 7 | 1692.0 | 807.9 | |
8 | 1702.6 | 810.4 | |||
9 | 1713.5 | 815.4 | |||
4 | 406.4 | 10 | 1710.8 | 818.3 | |
11 | 1715.2 | 821.4 | |||
12 | 1716.7 | 821.1 | |||
1999 | 1 | 405.8 | 1 | 1717.8 | 820.2 |
2 | 1714.1 | 819.1 | |||
3 | 1714.9 | 818.7 | |||
2 | 404.7 | 4 | 1711.0 | 818.5 | |
5 | 1706.9 | 815.2 | |||
6 | 1715.3 | 817.3 | |||
3 | 408.4 | 7 | 1723.8 | 822.6 | |
8 | 1720.6 | 825.0 | |||
9 | 1726.2 | 825.0 | |||
4 | 412.1 | 10 | 1737.9 | 830.8 | |
11 | 1734.1 | 831.1 | |||
12 | 1729.1 | 830.2 | |||
2000 | 1 | 413.6 | 1 | 1726.5 | 830.0 |
2 | 1731.5 | 831.4 | |||
3 | 1737.4 | 838.9 |