Some of the New Engineering Contract pilot projects in Hong Kong: (i) Tseung Kwan O-Lam Tin Tunnel - Road P2 and associated works (top left); (ii) Retrofitting of Noise Barriers on Tai Po Tai Wo Road near Po Nga Court (bottom, first left); (iii) Happy Valley Underground Stormwater Storage Scheme (bottom, centre); (iv) Design and Construction of Tin Shui Wai Hospital (bottom right); (v) Improvement of Fresh Water Supply to Cheung Chau (right, second top); and (vi) Photovoltaic System at the Siu Ho Wan Sewage Treatment Works and Three Energy-related Studies (top right). |
Close |