NTT |
Index
|
|
|
22 April 2024
|
NTT A1 |
Location of tender box
|
|
– |
4 October 2021
|
NTT A2 |
Procedures for opening tenders
|
|
– |
4 October 2021
|
NTT A3 |
Pre-tender Meeting
|
|
– |
4 October 2021
|
NTT A4 |
Clarifications from *Engineer/ Surveyor/ Supervising Officer designate
|
|
– |
4 October 2021
|
NTT A5 |
Check list for tenders deposited in the tender box
|
|
|
28 September 2023
|
NTT A6 |
Electronic submission
|
|
|
30 June 2022
|
NTT A7 |
Changes in status of qualifications
|
|
– |
4 October 2021
|
NTT A8 |
Regulating actions on inappropriate conducts
|
|
– |
4 October 2021
|
NTT A9 |
Regulating Action (Serious Incident or Conviction for Site Safety or Environmental Offences)
|
|
[Update of reference]
|
22 April 2024
|
NTT A10 |
Anti-collusion
|
|
– |
4 October 2021
|
NTT A11 |
Formula Approach
|
|
[Update for merit / demerit point for safety]
|
22 April 2024
|
NTT A12 |
Marking Scheme Approach
|
|
[Update for merit / demerit point for safety]
|
22 April 2024
|
NTT A13 |
Evaluation method for use in tenders which EMSTF may be a potential bidder
|
|
|
24 January 2022
|
NTT A14 |
Assessment of EMSTF offer
|
|
– |
4 October 2021
|
NTT A15 |
Net present value analysis
|
|
– |
4 October 2021
|
NTT A16 |
Destruction of documents
|
|
– |
4 October 2021
|
NTT A17 |
Bid challenge (WTO GPA)
|
|
– |
4 October 2021
|
NTT A18 |
JV Proforma
|
|
– |
4 October 2021
|
NTT A19 |
Not used
|
-- |
– |
--
|
NTT A20 |
Eligibility to Tender and for the Award of Contracts Applicable to Confirmed Group [B] Contractors
|
|
|
30 September 2022
|
NTT A21 |
Not used
|
--
|
–
|
--
|
NTT A22 |
Bonus for joint venture with listed contractor in lower group or with probationary status
|
|
–
|
13 September 2023
|
NTT B1 |
Not used
|
– |
– |
--
|
NTT B2 |
Constraints on *Engineer/ Surveyor/ Supervising Officer’s power
|
|
– |
4 October 2021
|
NTT B3 |
Not used
|
-- |
– |
--
|
NTT B4 |
Not used
|
-- |
– |
--
|
NTT B5 |
Assessment of Section Subject to Excision
|
|
– |
4 October 2021
|
NTT B6 |
Employer’s power to reduce Contingency Sum
|
|
– |
4 October 2021
|
NTT B7 |
Lump sum contract
|
|
– |
4 October 2021
|
NTT B8 |
Advance Payment under Capital Works Contracts
|
|
|
10 March 2022
|
NTT C1 |
Engagement of Sub-contractors who are Registered under the Respective Trades and Groups available in the Registered Specialist Trade Contractors Scheme (RSTCS)
|
|
[Update of reference]
|
10 April 2024
|
NTT C2 |
Payment for Sub-contractor Management Plan
|
|
[Update of reference]
|
10 April 2024
|
NTT C3 |
Details of Sub-contractor Management Plan
|
|
[Update of reference]
|
10 April 2024
|
NTT C4 |
Non-contractual partnering
|
|
– |
4 October 2021
|
NTT C5 |
Not used
|
-- |
– |
--
|
NTT C6 |
Dispute Resolution Advisor System
|
|
– |
4 October 2021
|
NTT C7 |
Systematic Risk Management
|
|
[Textual update]
|
22 April 2024
|
NTT C8 |
Professional Indemnity Insurance
|
|
|
30 June 2022
|
NTT C9 |
MTRC indemnity
|
|
– |
4 October 2021
|
NTT C10 |
Proof of plant ownership
|
|
– |
4 October 2021
|
NTT C11 |
Employing Site Workers for the Contract and Payment of Site Workers’ wages
|
|
– |
4 October 2021
|
NTT C12 |
Reimbursement of actual payment made by the Contractor to Assistant Clerical Officer (Labour Relations)
|
|
– |
4 October 2021
|
NTT C13 |
Site Cleanliness and Tidiness – Daily Cleaning and Weekly Tidying
|
|
|
30 June 2022
|
NTT C14 |
Site Uniform
|
|
– |
4 October 2021
|
NTT C15 |
Mandatory Construction Industry Collaborative Training Scheme (CICTS)
|
|
– |
4 October 2021
|
NTT C16 |
Employment of Graduates of the Enhanced Construction Manpower Training Scheme (ECMTS)
|
|
|
22 April 2024
|
NTT C17 |
Pay for Safety Performance Merit Scheme
|
|
– |
4 October 2021
|
NTT C18 |
Tree preservation
|
|
– |
4 October 2021
|
NTT C19 |
Tree pruning works
|
|
– |
4 October 2021
|
NTT C20 |
Environmental management
|
|
– |
4 October 2021
|
NTT C21 |
Use of non-road mobile machinery approved under the Air Pollution Control (Non-road Mobile Machinery) (Emission) Regulation
|
|
– |
4 October 2021
|
NTT C22 |
Provision of temporary electricity and water supply to Works Area(s)/Site(s)
|
|
– |
4 October 2021
|
NTT C23 |
Limiting tiers of sub-contracting
|
|
– |
4 October 2021
|
NTT
|
Complete set of NTT in PDF format
|
|
|
22 April 2024
|