Skip to content

Construction Sector Matters

Audit Check Fee to be Charged to Developers by Government Departments

Works Audit Check Fee1 To be Charged by Effective Date
connection to the public drainage/sewage system $4,340 per case 2 Drainage Services Department 1 September 2024
provision of water supply connection $6,450 per case with connection not exceeding 7m in length 3

$95 for each meter in excess of 7m
Water Supplies Department 1 August 2018

1 Subject to annual review.

2 It means 'per HBP1 submission' regardless of the number of connections.

3 It denotes the actual length of the connection main measured from the centre of the isolation valve for the tee connection up to the lot boundary.